body,date,text,page,path OaklandRedevelopmentSuccessorAgencyandtheCityCouncil,2015-05-19,"Concurrent Meeting of the Oakland Meeting Minutes May 19, 2015 Redevelopment Successor Agency and the City Council addresses on all the streets that qualify for RPP funding. The study shall follow City practice that all addresses with frontage (including the back or the side of a building) to a street eligible for RPP signs are eligible to obtain RPP permit(s). In addition to identifying all the addresses, the study shall also identify how many permits each address is qualif(ed for based on the amended TDM. While the TDM describes the number of permits the Hospital will fund, this in no way reduces the maximum number of permits that can be retained within an RPP Area pursuant to the Oakland Municipal Code 10.44.070C, as it may be amended. 2. The City shall modify certain requirements for establishing an RPP area in the RPP Area: a. City shall lower the current requirement from 75% to a lower percentage recommended by staff for all on-street parking spaces within the proposed area to be occupied during any two one-hour periods between 8:00 a.m. and 6:00 p.m. b. City shall lower the current requirement to have at least six adjacent block fronts to be included in each area to obtain signatures representing at least 51% of the residential units in each of the blocks within the proposed Residential Permit Parking area. All blocks within the RPP Area are eligible for the program regardless of block adjacency. c. City shall lower the requirement to have at least 80% of each eligible block front be residentially zoned. 3. Zone A shall include all the blocks identified in the attached figure except those designated as in zone B. Zone B shall include Aileen Street from Shattuck Avenue to Market Street, 56th Street from Shattuck Avenue to Market Street, 55th Street from Genoa Street to Market Street, Dover Street from 56ih Street to Aileen Street, and Genoa Street from 55th Street to Aileen Street as identified in the attached figure. 4. CHRCO shall retain a qualified transportation consultant, as its sole cost and expense, to perform a Post-Construction Parking Study in the RPP Area pursuant to the amended TDM Program after construction of the project is completed. Separate Post-Construction Parking Studies shall be performed for zone A and zone B which analyze the different and inter-related demand pressures depending on distance from CHRCO. 5. For RPP zone A, CHRCO shall pay for the RPP permits for a duration of ten years from the start of RPP zone A (as determined by when the first RPP permit in zone A has been issued and the RPP program is enforceable), and shall include up to one year post-construction if that still is within the ten year time-frame. For RPP Zone B, CHRCO shall pay for the RPP permits for a duration of ten years from the start of RPP zone B (as determined by when the first RPP permit in zone B has been issued and the RPP program is enforceable), and shall include up to two years post-construction if that still is with.in the ten year time-frame. If construction lasts longer than ten years, CHRCO will be obligated to pay for the RPP permits for the additional length of construction. Any CHRCO obligations to pay for the RPP permits shall be based upon the then current Master Fee Schedule. A motion was made by Kalb that this matter be Adopted as Amended. The motion carried by the following vote: Excused: 1 - Reid Recused: 1 - - Guillén Aye: 6 - Brooks, Campbell Washington, Gallo, Kalb, Kaplan, and Gibson McElhaney City of Oakland Page 25 Printed on 6/3/2015",25,OaklandRedevelopmentSuccessorAgencyandtheCityCouncil/2015-05-19.pdf